PERTH BATHROOM GUIDE

How to find a bathroom renovator in Perth

Ask who will manage the whole renovation, including the work you cannot see once the tiles are laid.

A customer considering which trade company can help with a job

Plan and compare your renovation in five steps

In short

Find a Perth bathroom renovator by sending the same room photos, layout and suburb to a shortlist, then arranging site visits. Check the business and relevant trades through WA Building and Energy, confirm permit and strata requirements, and compare written quotes that name the waterproofing system and trade responsibilities. Agree on the contract, payment stages and handover records before demolition starts.

Step 1

Show what stays, what moves and how the room is used

Photograph the bathroom, measure the room and mark the existing shower, toilet, vanity and door. Separate replacing finishes from moving plumbing or removing walls. Mention leaks, soft flooring or damaged adjoining surfaces so the site visit can address the cause as well as the appearance.

Give your Perth suburb and access details. A ground-floor house and an upper-floor apartment need different delivery and waste-removal plans. If this is your only bathroom, ask how long the shower and toilet will be unavailable before choosing dates.

Details to include in your enquiry

Details to include in your enquiry
Send thisWhat it helps the renovator work out
Photos, dimensions and proposed layoutWhether the work is a replacement in place or needs changes to services and walls.
Suburb, floor level and accessWhether the business services your address and how trades, deliveries and waste will reach the room.
Fixture choices and who supplies themWhat can be priced now and which selections still need an allowance.
Known leaks and bathroom availabilityWhat needs investigation and whether you need temporary washing or toilet arrangements.

Step 2

Check the contracting business and its trade team

Ask for recent bathroom examples and customer referees, then check who will arrange the plumber, electrician, tiler and waterproofing installer. Get the name of the person supervising the job and ask who resolves a problem involving more than one trade.

Use WA Building and Energy’s licence search to check the relevant registrations and licences. Match the contracting business to the quote. Plumbing and electrical work need the appropriate licensed trades; a bathroom renovation company’s name alone does not establish those credentials.

For a home bathroom, building work valued at $20,000 or more that requires a building permit generally needs a registered building contractor. Ask your local government whether your scope needs a permit. The July 2026 increase to $50,000 concerns Class 10a buildings such as sheds and garages, rather than this type of home renovation.

Illustration of a licence check

Step 3

Settle property approvals before booking strip-out

Ask who obtains any required building permit, pays the fees and supplies the approval documents. Resolve this before authorising demolition or ordering a layout that depends on removing a wall.

For a strata property, give the strata manager or council of owners the proposed scope and check the scheme plan and by-laws. Ask whether floors, waterproofing or shared pipes are common property, and what permission the work needs. Landgate says structural alterations to a lot in a strata scheme need prior approval; the correct process depends on the proposal and scheme.

For example, in a Perth apartment, moving the toilet can raise questions about shared drainage as well as access for trades. Obtain advice on those changes before assuming a quote covers an approved layout. This is a planning example, not a claim about a particular building.

Step 4

Compare complete quotes, including waterproofing

Request written quotes after site visits using the same brief. A low total can leave you buying fixtures, organising trades or paying for repairs separately. Ask what each allowance buys and how concealed damage discovered during demolition will be priced and approved.

Waterproofing is the system that prevents water reaching vulnerable building materials. Ask the renovator to specify the system, installer and preparation work. WA’s August 2026 waterproofing bulletin highlights poor waterstop installation and application practices. A waterstop is a barrier that helps contain water at openings and shower boundaries. Ask how these details, drainage slopes and the manufacturer’s instructions will be addressed, particularly if you want an open shower.

Illustration of a written quote

Step 5

Agree on payments and completion records

WA’s Home Building Contracts Act covers fixed-cost home building contracts between $7,500 and $500,000. For covered work, obtain the Notice for the homeowner before signing and a written, signed contract. The usual maximum deposit is 6.5%, with a limited exception for qualifying off-site cabinetry work. Progress payments should cover completed work or supplied materials.

Confirm whether home indemnity insurance is required. WA guidance generally requires it for building work needing a permit and valued above $20,000. Where required, obtain the certificate before paying.

Put the start expectations, payment stages and approval process for changes in the agreement. At handover, inspect drainage and finishes with the renovator, record outstanding items, and collect waterproofing records, product instructions and applicable trade and approval documents. Keep them with the contract and invoices.

Illustration of a written agreement

Sources and useful links

Sources checked 7 October 2026

Browse all guides